What We Did
IL Solutions managed the conversion from the initial structural work through to the internal fit-out.
Part of the garage was partitioned off, leaving space for a car, while a new opening was created for bi-fold doors. Structural requirements were assessed, allowing the correct steel support to be specified and installed before the doors were fitted.
The new gym was thermally boarded and plasterboarded, with the walls and ceiling finished ready for use. Specialist gym flooring was installed, together with new lighting, sockets and a separate electrical supply.
Window tinting was added to allow in natural light without excessive direct sunlight. Provision was also made for a wall-mounted TV.
IL Solutions liaised with Building Control and coordinated trades throughout the project, from strip-out and structural alterations to final decoration and second-fix electrical work.