What we did
IL Solutions traced and addressed the leaking pipe before removing the saturated insulation and damaged materials.
Our electrician safely disconnected the unexpected underfloor heating system and removed it after consultation with the hotel's maintenance manager.
Repairing and rebuilding the floor structure, new insulation and cement board were then installed to create a solid base for the finished floor.
New tiles were laid to match the existing bathroom specification before the toilet and other fittings were reinstated to make the room ready to use.